Example of Shimizu Tunnel No 3 in UDEC 7.00

Version Notes:
UDEC 7.00

Level: Intermediate
Runs in Demo: No

Write Up
Walk Through
Project Files
This example demonstrates the use of UDEC to model a tunnel excavation in a jointed rock mass.

This example demonstrates the use of UDEC to model a tunnel excavation in jointed rock mass. In this demonstration, geometry sets are used to create the tunnel geometry. The Barton Bandis model is used to represent the joints. The "block solve relax" command is used to simulate the pre-relaxation of the rock mass while excavating the tunnel.

Keywords

  • Geometry sets
  • Barton-Bandis
  • Ground reaction curve
  • Shotcrete
  • Bolt
  • Itasca has announced the release of FLAC2D v9 Itasca has announced the release of FLAC2D v9, revolutionizing the way we analyze and predict...
  • 6th Itasca Symposium on Applied Numerical Modeling The next Itasca Symposium will take place June 3 - 6, 2024, in Toronto, Canada....

29 4月
PFC In-Person Introductory Course
Live in-person introductory training course. This four-day course provides guidance in the use of the Itasca codes PFC2D and PFC3D to s...
29 5月
Getting Started with FLAC2D/FLAC3D
Objectives of the training: •Understand the FLAC2D/ FLAC3D numerical approach and the types ofproblems it can solve•Know how to manipul...
5 6月
IMAT Workshop
ITASCA is launching IMAT (Itasca's Mining Analysis Toolbox) our groundbreaking software tailored exclusively for underground and open p...