A circular lined tunnel is constructed in saturated ground. The ground is dewatered during construction. The tunnel is supported by a temporary shotcrete liner, which is installed while the tunnel excavation is advanced. A final cast-in-place concrete liner is then constructed. The water level is then returned to the original level. The analysis determines the forces and moments that develop in the concrete liner when the water level is returned to the original level, and when the temporary shotcrete liner loses strength.

Keywords:

  • Circular
  • Tunnel
  • Saturated soil
  • Dewatering
  • shotcrete
  • concrete
  • liner

Materials:

  • Concrete
  • Soil
  • Water

Analyses:

  • Fluid Flow
  • Static
Neuesten Nachrichten
  • Itasca Celebrates 40 Years Itasca is celebrating 40 years of solving geomechanical and hydrogeological challenges through engineering and computer...
    Weiterlesen
  • Introducing Our New IMASS Constitutive Model The Itasca Constitutive Model for Advanced Strain Softening (IMASS) has been developed to represent the...
    Weiterlesen
  • Learning FLAC3D 7.0 New FLAC3D introductory tutorials are now available on our website. See how easy it is...
    Weiterlesen

Kommende Veranstaltungen
6 Aug
Itasca Training Collaborations
Quality courses offered outside Itasca.... Weiterlesen