Hydroelectric Power Plants

In addition to hydroelectric dams, Itasca has worked on hydroelectric power plants including a pumped storage plant in Israel (Gavet) and hydropower stations in China (Baihetan, JinPing), India, and Colombia (Guavio and Sogamoso). Engineering analyses include site characterization, review of in-situ stress measurements, ground support evaluation and recommendation, excavation stability of large caverns during prefeasibility and construction, and underground facility layout design, including surge chamber geometry.

Neuesten Nachrichten
  • User Defined constitutive Models (UDM) Auf unserer Homepage finden Sie jetzt eine neue Zusammenstellung von ausgewählten User Defined constitutive Models....
    Weiterlesen
  • FLAC3D 7.0 Erfahren Sie mehr über die neuen Funktionen von FLAC3D Version 7.0....
    Weiterlesen
  • PFC 6.0 Erfahren Sie mehr über die neuen Funktionen von PFC 6.0....
    Weiterlesen

Kommende Veranstaltungen
26 Nov
FLAC3D V7.0 Training Course November 2019
FLAC3D TMis a numerical modeling code for advanced geotechnical analysis of soil, rock, and structural support in three dimensions. FLA... Weiterlesen
17 Feb
Itasca Symposium 2020
The Fifth International Itasca Symposium will be held at the University of Vienna (Austria). The Symposium will features the applicatio... Weiterlesen
9 Mär
FLAC 8.0 Introductory Training Minneapolis 2019
... Weiterlesen